Commit graph

21 commits

Author SHA1 Message Date
Codex
862d5a3cca Close evidence phase and prepare external M1 build 2026-10-24 13:50:56 +02:00
Codex
11426e7969 Record JPT Device Settings evidence 2026-10-24 13:21:10 +02:00
Codex
55646231a8 Record LightBurn general settings screenshots 2026-10-24 13:18:57 +02:00
Codex
c509915ab8 Document disconnected LightBurn control-machine state 2026-10-24 13:12:54 +02:00
Codex
a22cb1e759 safety: validate M3 approval records 2026-10-21 21:57:52 +02:00
Codex
c382ea9a78 safety: add immutable M3 review packets 2026-10-21 21:55:28 +02:00
Codex
ed59b928c9 safety: define fail-closed M3 research protocol 2026-10-21 21:52:04 +02:00
Codex
a5a8e4086d test: require human review for M1 acceptance 2026-10-21 18:37:50 +02:00
Codex
9230ec514b build: bind M1 acceptance provenance 2026-10-21 15:26:33 +02:00
Codex
fe2625e423 refactor: isolate Rayforge driver registry seam 2026-10-21 15:18:50 +02:00
Codex
415b00e157 build: pin upstream contracts and license notices 2026-10-21 14:27:34 +02:00
Codex
ffbff9805c docs: keep project status and links current 2026-10-21 09:57:05 +02:00
Codex
d1eca70252 test: generate checksummed M1 acceptance kit 2026-10-21 08:45:03 +02:00
Codex
6cd59ea624 test: define manual M1 acceptance contract 2026-10-21 08:39:36 +02:00
Codex
28de151e65 build: verify portable Windows checkpoints 2026-10-21 08:33:50 +02:00
Codex
f8d3c889e3 build: add no-device M1 acceptance checkpoint 2026-10-20 21:03:48 +02:00
Codex
2a3cd54aa8 Record offline M1 status and remaining gates 2026-10-19 19:52:58 +02:00
Codex
202e756071 evidence: analyze LightBurn device exports 2026-10-19 10:14:45 +02:00
Codex
efa22ff098 docs: record live JCZ USB enumeration
Record the read-only Windows PnP observation of USBLMCV4 at 9588:9899, distinguish the absent local driver from the installer driver family, and omit the device-specific instance suffix from public history.
2026-10-17 17:15:23 +02:00
Codex
2059fe90e6 docs: define product and hardware research roadmap
Turn the LightBurn-clone ambition into reviewable milestones from an offline galvo workbench through gated JPT integration and later CO2 backends. Record what the installer evidence can and cannot establish, and require bulk-transfer cost warnings.
2026-10-17 16:47:15 +02:00
Codex
f2ba4c6743 docs: record phase 0 acquisition status 2026-10-17 16:40:41 +02:00